Comprehensive Summary of LMH Health Projects

5By5 Engineers has played a pivotal role in the development and enhancement of various facilities at LMH Health, showcasing a robust partnership grounded in innovation, efficiency, and excellence. Our engineering expertise has been instrumental in improving the infrastructure and operational capabilities of LMH Health, ensuring a state-of-the-art environment for patient care and staff efficiency. Below is a detailed overview of our significant projects with LMH Health, highlighting our commitment to quality and our collaborative approach.

Inpatient Pharmacy Upgrade

Project: LMH Health Inpatient Pharmacy
Scope: Comprehensive upgrade of the inpatient pharmacy facilities.
Details:

  • Modernization: Implementation of cutting-edge technology and systems to streamline pharmaceutical operations.

  • Safety Enhancements: Improved safety protocols and features to ensure the secure handling of medications.

  • Workflow Optimization: Redesign of the pharmacy layout to enhance workflow efficiency and reduce operational bottlenecks.

  • Sustainability: Introduction of energy-efficient systems to reduce the environmental footprint of the pharmacy.

https://www.5by5eng.com/projects/lmh-health-inpatient-pharmacy

AHU-7 Replacement

Project: LMH Health AHU-7 Replacement
Scope: Replacement of Air Handling Unit (AHU-7) to enhance HVAC performance.
Details:

  • Advanced HVAC Systems: Installation of a new, high-efficiency AHU to improve air quality and climate control within the facility.

  • Energy Efficiency: Integration of energy-saving technologies to reduce operational costs.

  • Patient Comfort: Enhanced air distribution systems to ensure optimal comfort levels for patients and staff.

  • Reliability: Increased reliability and longevity of the HVAC system to support uninterrupted healthcare services.

https://www.5by5eng.com/projects/lhm-health-ahu-7-replacement

West Campus Development

Project: Lawrence Memorial Hospital Health West Campus
Scope: Comprehensive development of the new West Campus.
Details:

  • Full-Scale Engineering Services: Provision of complete MEP (Mechanical, Electrical, Plumbing) engineering solutions.

  • Modern Infrastructure: Development of state-of-the-art healthcare facilities to expand LMH Health’s service capabilities.

  • Sustainable Design: Implementation of sustainable building practices to create an eco-friendly campus.

  • Community Focus: Creation of a community-centric environment that supports both patient care and local engagement.

https://www.5by5eng.com/projects/lawrence-memorial-hospital-health-west-campus

COVID-19 Response

Project: Lawrence Memorial Hospital Health COVID-19 Response
Scope: Rapid response and adaptation of facilities to address the COVID-19 pandemic.
Details:

  • Temporary Facilities: Design and installation of temporary structures to handle the surge in patient volume.

  • Safety Protocols: Enhancement of ventilation and filtration systems to minimize the risk of airborne transmission.

  • Emergency Readiness: Swift adaptation of existing facilities to meet the urgent needs of the pandemic response.

  • Support Systems: Development of support systems to ensure the safety and well-being of patients and healthcare workers.

https://www.5by5eng.com/projects/lawrence-memorial-hospital-health-covid-19-repsonse

 

Key Features

  • LENGTH OF RELATIONSHIP

    ~8 years

  • PROJECTS COMPLETED

    20+

  • TOTAL COSTS

    $25,000,000+

  • AVG. PROJECT DURATION

    ~2 years for design/construction

  • NOTABLE ACHIEVEMENTS

    Design elements that have led to cost savings in energy and construction.

    • Example: The LMH team thought they were going to need to upgrade their lab exhaust fan system, costing ~$200,000 but we were able to adjust the controls so that an equipment upgrade was not needed. Our services cost them ~$5,000 compared to the $200,000 they saved, in addition to energy savings.

  • SPECIFIC SERVICES

    • MEP system design

    • Troubleshooting

    • Commissioning

Collaborative Relationship

The partnership between LMH Health and 5By5 Engineers is built on a foundation of mutual respect, shared goals, and a commitment to excellence. Together, we have navigated complex challenges, implemented innovative solutions, and consistently delivered projects that enhance the quality of healthcare services. Our collaborative efforts have not only improved the infrastructure of LMH Health but have also contributed to the overall well-being of the community it serves.

5By5 Engineers is proud of the work accomplished in partnership with LMH Health. Our projects reflect a dedication to quality, innovation, and sustainability. As prospective clients consider our services, we invite them to view our work with LMH Health as a testament to our capabilities and our commitment to creating environments where healthcare can thrive.

For more information about our projects and services, please visit our Projects page.


Notable LMH Health Case Studies

At 5BY5, we have years of experience working with partners in design and construction. We’re excited to put our innovative expertise to work to make any project we take on a success. Have a project you’d like to discuss? Work with us.

Next
Next

St. Luke’s East Hospital Flex Capacity Expansion