CASE STUDIES
LMH Cancer Center Renovation
LMH Health faced a significant challenge with their Cancer Center, which had outgrown its space and was operating with outdated mechanical, electrical, and plumbing (MEP) systems.
CMH Ground Floor HVAC Equipment Upgrades
Children’s Mercy Hospital’s ground floor HVAC systems were outdated, with controls and equipment that were difficult to maintain. The air changes were uncertain, and the system’s reliability was in question, creating significant concerns for maintaining air quality and infection control in a healthcare environment.
St. Luke’s East Hospital Flex Capacity Expansion
St. Luke’s East Hospital was seeking to expand their new Flex Care Facility in order to accommodate long-term and short-term stays, while also being an overflow space for the existing emergency department.
LMH Health Inpatient Pharmacy
LMH Health sought MEP systems for a new USP 797-compliant pharmacy. This included integrating a new dedicated AHU specifically for the compounding pharmacy.
LMH Health – AHU-7 Replacement
LMH Health engaged 5BY5 Engineers in replacing their existing AHU-7 with 2 units that can back-feed one another in the event of failure or maintenance shutdowns.