CASE STUDIES
LMH Cancer Center Renovation
LMH Health faced a significant challenge with their Cancer Center, which had outgrown its space and was operating with outdated mechanical, electrical, and plumbing (MEP) systems.
CMH Ground Floor HVAC Equipment Upgrades
Children’s Mercy Hospital’s ground floor HVAC systems were outdated, with controls and equipment that were difficult to maintain. The air changes were uncertain, and the system’s reliability was in question, creating significant concerns for maintaining air quality and infection control in a healthcare environment.
Children’s Mercy Hospital In-Patient Tower Backup AHU
Children’s Mercy Hospital was looking for increased reliability, easier maintenance, and redundancy in the air distribution system serving their inpatient tower.