5BY5 was tasked with replacing the MEP systems in a historic 2-story building in the Crossroads district of Kansas City, MO.
5BY5 Engineers successfully completed an engineering project to replace the MEP systems for The Monogram building, a 2-story historic building located in the Crossroads district. Before the project, the building was roughly ¼ occupied, and all MEP systems were old and in need of replacement. 5BY5 was brought in because of their partnership with Rose Design Build, a repeat client with whom they enjoy working.
During the course of the project, 5BY5 provided new MEP systems for all tenant spaces. Different HVAC systems were also utilized for different tenant spaces based on space use and tenant space size. Although the building came with some minor design and construction challenges as a result of its age, the upgrade of MEP systems was successful, and the project went relatively smoothly.
The building won a 2020 Historic Preservation Award, and all tenant spaces except one now occupied. Since the project's completion, 5BY5 has not been made aware of any MEP operational issues but is still monitoring the effectiveness of their MEP system implementations.
5BY5 looks forward to future projects with Rose Build Design and Monogram to continue our high standard of service to our clientele and the communities they serve.
PROJECT SIZE/COST
$3.0-$3.5 Million
LOCATION
Kansas City, MO
PROJECT TIMELINE
January 2019 - Present
ENGAGEMENT
MEP Systems Replacement
HVAC Installation
KEY INDIVIDUALS
Scott Groshans
Brock Centlivre
CLIENT
Rose Design Build
Monogram Building
Construction PM
Rose Design Build
ARCHITECT
Rose Design Build
MEP DESIGN
5BY5 ENGINEERS